The Lake County Division of Transportation’s $90 million 2022 construction program is split between big projects carried over from last year and a mix of new ones scheduled this season.
Altogether, about three dozen transportation projects will be spread throughout the county. The project list includes 48 miles of road resurfacing, nearly 12 miles of new or widened pavement, and bridge and culvert replacements as well as bike path connections.
An interactive map with locations and descriptions of projects in the 2022 program will be available soon at lakecountyil.gov/transportation.
In the Barrington area, the 2022 construction program includes about $3 million to replace existing culverts with a single span bridge at Flint Creek, resurface Hart Road and build a multiuse path.
That project includes an incentive for the contractor to be done early and a penalty if the road closure goes beyond 155 calendar days.
Read more here.
Leave a Reply